Engine TV2-117ag
Vendor code: 129806 19 February 6 0
Engines TV2-117ag
With documents. Formulars on request. Mothballed.
First engine (left):
- SNE is 9,383 hours.
- PPR production - 664 hours.
- The rest of the overhaul resource is 836 hours.
- The year of release is 1970.
- Place of repair - Uzga.
The second engine (right):
- SNE is 10,687 hours.
- Employment PPR - 1,842 hours.
- The rest of the overhaul resource is 158 hours.
- The year of release is 1981.
- Place of repair - Uzga.
Two engines and gearbox VR-8A make up the power plant of the Mi-8 helicopter. The long service life of the Mi-8 helicopter in more than 30 countries confirms the high degree of reliability of power plant and equipment.
Serial production of TV2-117AG engines was launched in 1985 at the Perm motor factory. More than 24,000 engines have been produced, more than 13,000 engines continue to operate.
- State: Used
- Documents: Sold with documents
Show full