Cement plant
Vendor code: 130019 14 August 17 0
Cement plant 500 tons per day:
- Section of preparation of raw materials - crushing, drying and storage;
- The preparation section of the raw material mixture (shichta) - based on the ball of the ball f2.6 × 10m;
- A homogenization warehouse of a raw material mixture (shichta);
- The submitting section to the furnace and pre -heating cyclones (5 cyclones);
- Clinker firing section - on the basis of the stove rotating f3.5 × 60m;
- Clinker grinding section -on the basis of the ball of the ball f2.4 × 13m;
- Cement storage section;
- Cement packaging section;
- Automation system;
- Laboratory.
The principle of operation of a full -cycle cement plant:
1. The starting raw materials - limestone, clay, additives - enters the warehouse where crushing, drying and loading into storage silos is carried out;
2. From silos, the material is unloaded to the strip dispensers and enters the ball mill;
3. In a ball mill is carried out by a paraul to a 100-200 microns' faction and is unloaded into a silos of homogenization;
4. In the silos of homogenization, the composition of the raw material is aligned to obtain a stable composition of the final product;
5. From the silos of homogenization, the raw material score enters the cyclones of preliminary heating, and then is burnt in a rotating furnace at a temperature of up to 1,500 degrees and passes through the cooler into an intermediate bunker;
6. Of the intermediate bunkers, the clinker, gypsum and other additives are dosed, which go to the ball mill and are waved to the necessary subtlety (according to GOST - the remainder on a sieve of 80 microns is not more than 15%);
7. The finished product (cement) is unloaded into silos for further shipment in cement trucks or directions to the packaging line in bags.
- State: New
- Payment: Wire transfer
- Documents: Sold with documents