Power station PAES-2500M
Vendor code: 25197 99 0
Power plant PAES-2500M for sale
1) gas turbine unit GTU-2, 5P, release date 04/18/1995, reopened on 11/01/1996 Routine work was carried out regularly, last 05/22/2013 In fact, 35 455 hours were worked out after the overhaul life was extended. 03/04/2013 there was an extension of the overhaul life before overhaul for the fourth 3,000 h stage of extension until the operating time of 37,000 hours. 2) Engine D-30EU-1 release date 04/18/1995, re-entry was made on 11/01/1996 In fact, 35 455 hours have been worked out after extending the overhaul life. 03/04/2013 there was an extension of the overhaul life before overhaul for the fourth 3,000 h stage of extension until the operating time of 37,000 hours. Generator - SGS-14-1006U2 20859, synchronous ;
- State: Used
Show full