Place an ad

Wind tunnel Ø 2.8 m.

350 629 $

Vendor code: 3279 977 13


For sale nThe latest indoor wind tunnel for sports and entertainment.

The best solution for beginners. An excellent option for sport flights (up to 4 VFS). Suitable for installation in any region for year-round use. The best price on the world wind tunnel market. The shortest payback period for the project (about 36 months)

For the first time in wind tunnel designs, the fans are installed on double vibration-isolated supports, which ensures the absence of vibrations on the wind tunnel body and in the service building.

Thanks to its high efficiency, the maximum power of the wind tunnel is only 670 kW.

This wind tunnel demonstrates a unique combination of compactness and simplicity of design with high technical characteristics.

The highest level of safety is ensured by a net with a patented Safe Landing System (SLS).

Specifications

  • Dimensions (L.W.H.) 16.6x6.5x16.6 m
  • Flight chamber: Glass - D 2.8 m, H 5 m, Total height 8 m
  • Power max. 670 kW, Fans D 1800 mm (4x160 kW)
  • Cooling:

- Forced air exchange

- Heat exchange from the chiller (optional)

  • Weight 50 t

Equipment

  • Air duct housing
  • Rotary blade assemblies
  • Fans (with motors) 4 pcs.
  • Cooling system
  • Flight camera
  • Airlock vestibule (for 10 people) with noise reduction system
  • Frequency converters 4x160 kW
  • Computer control system
  • Color lighting system
  • Net with energy-absorbing safe landing system

Options

  • Improved controllable lighting system
  • Noise reduction system in the flight chamber
  • Heat exchange (water) cooling system
  • Chiller
  • Sport equipment
  • European CE certification

Price and Delivery Terms

  • Price in rubles at the Central Bank exchange rate, (Installation supervision is 1% of the equipment cost), (Installation is 7% of the equipment cost).
  • Prepayment 60%
  • Final payment 40% (until shipment)
  • Delivery terms - pick up
  • Production time 5 months
  • 12 month warranty. Fan service life is at least 8000 hours.

What you need to start

  1. Convenient location
  2. Complex project
  3. Installation, construction and finishing
  4. Recruitment and training of personnel. Minimum: 1 manager, 2 administrators, 6 instructors
  5. Power connection
  6. Equipment (overalls, helmets, shoes) 20 sets

Installation

  • Separate location on its own plot of land
  • Inside sports or shopping and entertainment complexes.
  • The supporting frame of the AKM-VWT-240 can be covered with glass panels for techno design and noise reduction. Requires chiller cooling.
  • Installation using existing traffic generation points Adjacent territories of large shopping and sports facilities

  • State: New

Show full


You may be interested